Assignning $/hs
1 Comment
The resource is assign a cost. and the task is assigned a cost.
When the resource is assigned to the task the task cost will change based on the sum or them both.
The resource is assign a cost. and the task is assigned a cost.
When the resource is assigned to the task the task cost will change based on the sum or them both.
Fabiana Iglesias
How can I assign a different $ / hs to a resource (same person, different tasks)?
1 person has this question